专题报道| 图片新闻| 教育互动| 在线报名| 论坛交流| 网上办公| 网络教室|  
| 职教新闻 | 学校简介 | 教师园地 | 学生地盘 | 服务家长 | 职业规划 | 专业设置 | 企业培训 | 考试认证 | 资料下载 |
      栏目导航   当前位置:网站首页>>评论
发表人:rftwtfw88

IP:192.186.24.112

发表人邮件:yuguhun1@126.com 发表时间:2018/12/18 14:47:16
East Bank Road:The East Bank Demerara Public Road was laid out early in the colonial days when all of the countryside was plantations and not the villages that abound now. Over the years,Cheap Authentic Jerseys, as the country grew,Cheap Jerseys Free Shipping, the original dirt roads were eventually capped and paved further and further from the city. According to the British Guiana Handbook 1922, the East Bank Road ran from Georgetown to Coverden at the time.In recent years,Jerseys NFL China, the road has not deviated much from the path that was laid out before the turn of the nineteenth century, it has simply been rebuilt and resurfaced.A section of the Craig revetment that is slowly slipping into the river When the road was laid out however, traffic consisted of either carriage or foot making the proximity of the road to the river no concern. But as the years have piled up the Demerara River has encroached closer and closer to the roadway. This erosion of the river bank coupled with the enormous traffic loads and frequencies that the road sees today, has experts saying that it is only a matter of time before the road gives way with dire consequences.According to Mr. Phillip Allsopp, “The road is bound to fail and it will be a scandal and a disgrace.” Allsopp has held the post of Chief Works and Hydraulics Officer in years past and has extensive experience in road and highway building and management.He was at the time commenting on the $64M revetment works currently being undertaken at Craig. He noted that the works are just a temporary fix but the kind of loading that the road currently undergoes will eventually prove to be too much for the roadway and the river bank.Allsopp also pointed out that if the government intended to have the East Bank Demerara Public Road serve as the final link in the proposed Georgetown-Manaus corridor which passes through Linden,Maglia Inter Nuova, Lethem and Boa Vista, then the road will definitely fail, resulting in a huge loss of face for Guyana.The volume of commercial traffic that will utilise the road will be immense since the intention of the corridor is to create a shorter route for Brazilian merchandise seeking to access intercontinental shipping ports.Currently,Cheap Air Max, merchandise to be shipped out of Manaus, Brazil goes to Puerto la Cruz in Venezuela, a trip of more than 1,903km. If the Georgetown-Manaus route becomes a reality, businesses could shorten the distance by almost 300km.Mr. Allsopp’s recommendation is that the Ministry of Public Works should divert the road away from the river or that an alternate link be made specifically to accommodate the heavier industrial traffic at a safer distance from the river.At present, works are currently being undertaken to construct a timber revetment for an area at the Craig riverside. More than 300 meters of riverbank are being shored up during these works but there are concerns that this may not be enough. Revetments have been used in these areas for some time now but over a period of years they eventually fail through the action of the river.A major issue of concern is that of rotational slippage that could compromise the structural integrity of the road. If the slip is severe enough,Maillot Psg 2019 Ext??rieur, the revetments could give way simultaneously and see entire sections of the road sliding into the river.Over the years,Jerseys From China, at least two sections of the revetment have slipped into the river.
 
专题报道 | 图片新闻 | 网站地图 | 联系我们 |
版权所有: 西昌起点电脑学校网站 2000-2010
蜀ICP备07502120号地址:西昌市胜利路102号<西昌市中医院对面三楼> 邮编:615000
电话:0834-3224806 邮箱: yuguhun1@126.com 联系QQ:23647373起点电脑学校为你服务8332060起点电脑学校为你服务
页面执行时间:62.500毫秒  [后台管理]